Metin Usta, Esat Demirel, and his head woodwork man Cumali, came to decide and make a work plan. Work will start on the front façade of the living room, thus an interior scaffolding supporting the ceiling of the living room as well as the rest of the building on top will be built. 06.10.20120 - 08.10.2012 : The scaffolding is built.
Scaffolding in the hall way at this floor level is also needed:
09.10.2012 : Tuesday
Construction of the living room ceiling and that of the baywindow sticking out on the front façade is discussed.
Metin Usta and Hasan Usta take measurements and samples from the decorative wood balustrades of the roof-terrace.
No comments:
Post a Comment