36 Bedroom - Interior Wall - Horizontal Laths

14.11.2012 : Wednesday - 17.11.2012 : Saturday

After the timber-frame work of the interior bedroom wall is finished, the next step has started: "çıtalama". 1.5cm x 4cm wooden laths are mounted horizontally, in preparation of the special plaster that will be applied afterwards. This application is first done on the hall side of the wall. After the rockwool and electrical installations are put in place, the same will be done on the bedroom side as well. Then, it will all be ready for plaster and paint.