24.11.2012 : Saturday

Work starts on the inside: the plaster and horizontal laths on the inside of the bedroom side façade wall are taken down, thus exposing the old timber-frame structure.
 
26.11.2012 : Monday
 
In order to make the work both easier and safer, the roof tiles and lead gutter pieces are taken off from the roof on top the bedroom cantilever. The gutters will be re-done afterwards anyway.


 