Cafer Bozkurt, structural engineer Erol Yümlü and Şevket Usta in discussion!
The roof floor and eaves seen from below. Şevket Usta hurt his back, so he is not doing physical work today. He should be resting...
17.11.2012 : Saturday
Now that the main structural framework of the ceiling is completed, narrow laths have to be nailed in place, so as to hold the rockwool in place! Salih and Hacı Usta are perched on top of the ceiling, basically on the roof terrace.
27.11.2012 : Tuesday
Then, a double layer of rockwool is put in place!