Blog Archive

Tuesday, December 18, 2012

21 Roof Terrace - Floor Structure

31.10.2012 : Wednesday
 
As a continuation of the structural work done on the ceiling of the 1. floor, the floor of the roof terrace is tackled.

The side façade and old eaves seen in relation to the new main structure on the front façade:
The top of the 'cumba' (cantilevering baywindow) construction:
 

No comments:

Post a Comment