Wednesday, December 19, 2012

24 Living Room - Ceiling Main Beam

02.11.2012 : Friday

The place where the main beam of the living room ceiling will be placed is opened up:

























03.11.2012 : Saturday

To place the beam, the post on the front façade side needs to be notched-in 2 cm from the top, so as to allow for the new beam to fit perfectly with a small lip to keep it in place. Salih Usta is working on carving out that notch in-situ.






















 
On the interior wall side, the old column is replaced by a new one. Salih Usta and İbrahim haul in the heavy oak wood column. The new headpiece is also notched in 2cm.
 
05.11.2012 : Monday
Finally, the main beam is put in place, and secured with metal L-ties to the front façade. Salih Usta fastens the bolts!


 