Blog Archive

Tuesday, December 25, 2012

31 Bedroom - Floor Construction

12.11.2012 : Monday  -  13.11.2012 : Tuesday

The main floor beam carrying the small "cumba" (cantilevering bay window) on the front façade.





The main floor beams carrying the larger "cumba" (cantilevering bay window) on the side façade.

No comments:

Post a Comment